How can Critical Systems turn around a fully functional system so much quicker than the gas cabinet OEM?

Cabinet OEMs generally do not build to stock, and therefore the lead times are typically 8+ weeks to manufacture and deliver.

CSI carries the largest inventory of professionally decommissioned gas cabinets and panels in North America –500+ gas cabinets and 100+ panels – that enable us to quickly match systems that have been used on the same or gases in the same family.* Consequently, CSI’s lead time are much shorter — typically 2 weeks.

*Matching same or similar gases ensure that the new gas doesn’t react with the with any trace molecular residue that may have been absorbed in the seating materials (in regulators & valves).

No Comments

Sorry, the comment form is closed at this time.